A professional solar installation in Jamaica follows six steps — assessment, quote, supply, mounting, wiring, commissioning — and with equipment from local stock, the whole journey commonly takes days, not months. Complete systems start at J$522,000 installed.

Step 1–2: assessment and final quote

Loads are counted (free at btechj.com/solarestimate), then a final JMD quote covers everything: panels (605W, J$25,000 each), hybrid inverter (6kW–12kW, J$220,000–J$430,000), optional lithium storage (J$360,000–J$450,000), mounting, protection and labour. No growing numbers later.

Step 3–4: supply and mounting

Equipment comes from BTECH’s Ocho Rios warehouse — no shipping waits. Rails (J$6,000) anchor to rafters with engineered attachment points; panels torque down with mid (J$500) and end (J$450) clamps. Hurricane-aware mounting is non-negotiable here.

Step 5: wiring and protection

PV cable (J$200/ft) runs through proper conduit to DC breakers and surge protection (J$6,000), into the inverter, then AC protection and your panel board. This layer separates professional installs from fire hazards — it is where our own installers earn their keep.

Step 6: commissioning

System configuration, monitoring setup, and — for grid-tie — the JPS net billing application, which BTECH files for you. You watch production live from day one.

FAQ

How long on the roof?

Typical residential installs complete in 1–3 days on site.

Do I need to be home?

For key stages yes — we schedule around you.

Who handles warranty later?

The installer-seller — us. One counter for everything: 876-777-5488.